Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

PT Schneider electric manufacturing batam and new warehouse design with lean warehousing approach

This paper describes the warehouse project moving PT. Schneider ElectricManufacturing Batam from lot 13A to lot 04 and lot 208. The intentions of thepaper are to knowing disadvantages and advantages after warehouse projectmoving has done that can reduce space and balance all activities process inwarehouse. The effort for identifying the company and it has a significant impactso that decrease cost, reduce space and avoid of discrepancy.

Creator(s)
  • (25403077) ANDHIKA HANDOKO
Contributor(s)
  • I Gede Agus Widyadana → Advisor 1
  • FARIUS TJIOESMAN → Advisor 2
  • Herri Christian Palit → Examination Committee 1
Publisher
Universitas Kristen Petra; 2007
Language
English
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Undergraduate Thesis No.01041226/IND/2007; Andhika Handoko (25403077)
Subject(s)
  • WAREHOUSES-MANAGEMENT
  • INVENTORY CONTROL
File(s)

Similar Collection

by creator, contributor, or subject