Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Benchmarking the performance of construction procurement methods against selection criteria in Nigeria

The study developed performance indices by the widely used procurement options in Nigeria on selection criteria. The traditional mean and standardized ratio were used to form the utility coefficients. Results revealed that performance by the procurement options depended on the respondents? categorization and cost categorization of projects. Public clients ranked the lump sum contracts more able to achieve speed for projects up to N100 million (Naira) while the private clients believe it is the design-build. As regards quality, public clients rated the Build-Own-Operate-Transfer (BOOT) system as most able to achieve the quality criterion whereas private clients rated design-build for projects up to N100 million (Naira). The study then concluded that, in the Nigerian construction industry participants do not agree on the performance of the procurement options on selection criteria.

Creator(s)
  • STEPHEN OKUNLOLA OJO
Contributor(s)
-
Publisher
Universitas Kristen Petra; 2009
Language
English
Category
jou – Journal
Sub Category
-
Source
Dimensi Teknik Sipil, Vol. 11, No. 2, September 2009, 106-112; Stephen Okunlola Ojo (NA00000574)
Subject(s)
-
File(s)

Similar Collection

by creator, contributor, or subject