Key to solve nervous system at PT Schneider Electric Manufacturing Batam

PT Schneider Electric Manufacturing Batam is an industry that concern in
electrical component. There is a team in this company that conduct a Master
Production Planning (MPP) and vendor forecast, the MPP is a production
planning that contain several constrains. But there is a missing constrain, is a
warehouse capacity. By using DMAIC approach this project was started. In this
project, there is a tools that can control the inventory level at SEMB’s warehouse
(Batam Logistics Platform/BLP). With this tools, we can knowing the utilization
rate of the warehouse for six months ahead and knowing the most contribute of
the warehouse base on supplier view and commodity view. Available capacity in
BLP is 10,412.70 m3 with contain 47 rows. Then the utilization rate of warehouse
in May until June is about 63%-69% when demand is in low level. The utilization
rate warehouse in May until June when demand is in stable level is about 44%-
54%. And when demand is in high level, the utilization rate is about 34%-
48%.The additional information is to knowing the suppliers which use 80% space
of warehouse capacity and the commodity. There are 35 suppliers and there are 8
commodities that use more space in warehouse.

Creator(s)
  • (25412051) GRACIA VICKI WIDARSO
Contributor(s)
  • Jani Rahardjo → Advisor 1
  • I Nyoman Sutapa → Examination Committee 1
Publisher
Universitas Kristen Petra; 2016
Language
English
Category
s1 – Undergraduate Thesis
Sub Category
Tesis/Theses
Source
Undergraduate Tesis No. 03021887/IND/2016 Gracia Vicki Widarso (25412051)
Subject(s)
  • INVENTORIES--MANAGEMENT
  • WAREHOUSE--MANAGEMENT
File(s)

Similar Collection

by creator, contributor, or subject