Library's collection Library's IT development CancelASML is a leading technology company specializing in making machines that makes
semiconductors. These machines are used to produce chips for major technology companies
all around the world.
There are a lot of departments inside ASML. One of these departments is the Metrology
Department. One of the main tasks inside the department is to run tests on the machine
with algorithms that they have prepared. These test results are then collected to be studied
so that they can improve their machine. The problem that the department face is that they
have trouble with the Jenkins agent that often when offline when it matters most which
cause the availability of the MATLAB test results to be scarce, and they don’t have a clear
way of presenting the data as it is still recorded in the XML format which is chaotic and hard
to be read by the engineers. Therefore, the project is offered as a Graduation project by the
company. They needed an alternative to view these test results in a more presentable way
that can be understood by the engineers and is available anytime and anywhere.
The project begins with the initiation phase where there is research to be done for the tools
needed to be used with the project. Django is the framework used as it works well with
Python and allows easy conversion of the XML format. Other research includes the current
state of the data and how to access the data. Next up there is the Execution phase where all
the tools that will be used are installed and explored on how to provide the best solution to
the problem while also providing the design for the web application. The design will be done
in a document which will be presented to the company mentor for more feedback and
approval. When the design is accepted then the Implementation phase begins. In this phase,
there are small research to be done such as UI designs suitable for the application and
implementation of the framework tool to finish the first iteration of the project. The project
will then be reviewed and improved so that it matches what the company wants. Lastly, the
Finalization phase will be done where the intern will write the final report and continue to
provide small improvements to the application or bug fixing if needed. Once the solution is
finished, it is then presented to the company and implemented. Users can now view results
from the application at anytime without worrying about the Jenkins agent going down.