Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Supplier panel process improvement at PT X using supplier database

PT X is currently having a loss opportunity because of a long lead time in the Supplier Panel Process. This was caused by not having a dedicated supplier database for Indirect Material & Services procurement. The root cause of the problem was identified by DMAIC methodology and proposes the implementation of a Supplier Database to replace the current supplier database. The database would contain crucial supplier information such as the supplier's name, industry key, and PIC information, which would reduce the lead time for potential supplier references. By using the proposed improvement, PT X could reduce the lead time of supplier panel process by 15%.

Creator(s)
  • (C13190008) STEVANO NYOTO PRAWIRO
Contributor(s)
  • Nova Sepadyati, S.T., M.Sc. → Advisor 1
  • Jani Rahardjo → Examination Committee 1
Publisher
Universitas Kristen Petra; 2023
Language
English
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Undergraduate Thesis No. 02020035/IBE/2023; Stevano Nyoto Prawiro (C13190008)
Subject(s)
  • DATABASE DESIGN
  • PURCHASING--MANAGEMENT
  • TIME MANAGEMENT
File(s)

Similar Collection

by creator, contributor, or subject