| Project management checklists- Author(s)
- Stitt, Fred. A.
- ISBN
- 0442010729
- Dimension
- vii, 131 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02075/10 | 690.068 Sti P | Library - 7th Floor | Available |
| |
| Planning and managing interior projects- Author(s)
- Farren, Carol. E.
- ISBN
- 0876295375
- Dimension
- xxi, 554 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02074/10 | 690.068 Far P | Library - 7th Floor | Available |
| |
| Standard estimating practice- Author(s)
- Mahoney, William. D
- ISBN
- 9781557016164
- Dimension
- xii, 490 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01989/10 | 692.5021873 Ame S | - | Unavailable : Lost |
| |
| Air conditioning principles and systems- Author(s)
- Pita, Edward. G
- ISBN
- 0130928720
- Dimension
- xv, 524 p. / 25 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01988/10 | 697.93 Pit A | Library - 7th Floor | Available |
| |
| HVAC troubleshooting guide- Author(s)
- Miller, Rex
- ISBN
- 9780071604994
- Dimension
- xxiii, 692 p. / 23 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01984/10 | 697.000288 Mil H | - | Unavailable : Lost |
| |
| System diagnostics and troubleshooting procedures- Author(s)
- Tomczyk, John
- ISBN
- -
- Dimension
- 71 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01959/10 | 697.93 Tom S | Library - 7th Floor | Available |
| |
| Komposisi biaya pembangunan apartemen bertingkat tinggi- Author(s)
- Tanoyo, Rudy
- ISBN
- -
- Dimension
- xx, 245 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02485/10 | 692.5 Tan K | - | Unavailable : Removed |
| |
| Evaluasi kinerja dan efisiensi desain pseudo elastis terhadapa desain kapasitas sesuai SNI-03-2847-2002 pada bangunan tidak beraturan dengan coakan 40% 6- dan 10- lantai di wilayah 6 peta gempa...- Author(s)
- Oktavianus, Yusak
- ISBN
- -
- Dimension
- xxiii, 235 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01778/10 | 693.852 Okt E | Library - 8th Floor | Unavailable : Removed |
| |
| Penelitian awal pada high volume fly ash concrete- Author(s)
- Limantara, Stefanus
- ISBN
- -
- Dimension
- xiv, 58 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01766/10 | 691.3 Lim P | Library - 8th Floor | Unavailable : Removed |
| |
| Pemilihan material penghambat kebakaran pasif berdasarkan SNI 03-1736-2000- Author(s)
- Lauwmato, Darwin
- ISBN
- -
- Dimension
- xvi, 92 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01767/10 | 693.82 Lau P | Library - 8th Floor | Unavailable : Removed |
| |
| Studi awal produktivitas pemasangan bata ringan untuk pekerjaan dinding pada proyek bangunan tinggi- Author(s)
- Gunawan, Jeksen
- ISBN
- -
- Dimension
- xvii. 70 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01765/10 | 690 Gun S | - | Unavailable : Removed |
| |
| Analisa faktor yang mempengaruhi tahapan investasi pengembang perumahan- Author(s)
- Iklanata, Richard
- ISBN
- -
- Dimension
- xv, 116 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01762/10 | 690.068 Ikl A | Library - 8th Floor | Unavailable : Removed |
| |
| Pengaruh methyl cellulose dan redispersible polymer powder terhadap campuran mortar untuk pasangan bata dan plasteran- Author(s)
- Tanumidjojo, Handoyo
- ISBN
- -
- Dimension
- xv, 82 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01757/10 | 691.5 Tan P | Library - 8th Floor | Unavailable : Removed |
| |
| Evaluasi efisiensi perencanaan pseudo elastis terhadap desain kapasitas sesuai SNI 03-2847-2002 pada bangunan beraturan di wilayah 2 dan 6 peta gempa Indonesia- Author(s)
- Hadiwijaya, Intan P.
- ISBN
- -
- Dimension
- xxiii, 243 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01646/10 | 693.852 Had E | - | Unavailable : Removed |
| |
| Evaluasi kinerja dan efisiensi desain pseudo elastis dan desain kapasitas sesuai SNI-03-2847-2002 pada bangunan tidak beraturan dengan coakan 40% 6- dan 10-lantai di wilayah 2 peta gempa Indonesia- Author(s)
- Sindynata, Vielicenia
- ISBN
- -
- Dimension
- xxii, 243 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01639/10 | 693.852 Sin E | - | Unavailable : Removed |
| |
| Manajemen risiko pada kecelakaan kerja di proyek konstruksi- Author(s)
- Ferry
- ISBN
- -
- Dimension
- xx, 123 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01637/10 | 690.068 Fer M | - | Unavailable : Removed |
| |
| Analisa biaya konstruksi berdasarkan SNI 2008 dan aplikasinya- Author(s)
- Wijaya, Hendra
- ISBN
- -
- Dimension
- xxix, 378 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01618/10 | 692.5 Wij A | - | Unavailable : Removed |
| |
| Perbandingan rancangan parkir ditinjau dari kenyamanan dan waktu yang dibutuhkan untuk melakukan manuver- Author(s)
- Kurniawan,Willy
- ISBN
- -
- Dimension
- xviii, 144 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01619/10 | 690.538 Kur P | - | Unavailable : Removed |
| |
| Analisis hubungan antara tingkat tindakan tidak aman dan keefektifan pekerja pada proyek- Author(s)
- Negara, Devi Adeline Tandi
- ISBN
- -
- Dimension
- xix, 75 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01615/10 | 690.068 Neg A | - | Unavailable : Removed |
| |
| Pengukuran kualitas pekerjaan finishing pada suatu proyek konstruksi di Surabaya- Author(s)
- Verdian, Ephivani
- ISBN
- -
- Dimension
- xviii, 95 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01616/10 | 690.068 Ver P | - | Unavailable : Removed |
| |