| LKP : Ratu Dept. Store dan Supermarket- Author(s)
- Wiyono, Riawati
- ISBN
- -
- Dimension
- xi, 44 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01822/97 | 670.42 Wiy L-II | Library - 6th Floor | Available |
| |
| LKP : Hotel Maya- Author(s)
- Inabuy, Welda S.
- ISBN
- -
- Dimension
- x, 49 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01818/97 | 670.42 Ina L-II | Library - 6th Floor | Available |
| |
| LKP : proses produksi di PT Mitra Niaga Persada- Author(s)
- Puspasari, Dewi
- ISBN
- -
- Dimension
- v, 46 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01817/97 | 670.42 Pus L-I | Library - 6th Floor | Available |
| |
| LKP : peranan pengendalian kualitas dalam meningkatkan produktivitas pada PT Reka Nuansa Graha- Author(s)
- Sudarto
- ISBN
- -
- Dimension
- v, 51 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01815/97 | 670.42 Sud L-I | Library - 6th Floor | Unavailable : Removed |
| |
| LKP : tingkat kecacatan proses produksi kampas rem dan prosedur usulan pengontrolan mutu di PT Benin Internasional Raya Desa Mangliawan, Kec. Pakis-Kab. Malang- Author(s)
- Gosali, Ade
- ISBN
- -
- Dimension
- vii, 56 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01805/97 | 670.42 Gos L-II | Library - 6th Floor | Unavailable : Removed |
| |
| LKP : penyusunan perencanaan kebutuhan material (material requirement planning) sepeda mini jenis TL 24" New pada PD Sekar Mulia Bicycle Industries Surabaya- Author(s)
- Juliana
- ISBN
- -
- Dimension
- xiii, 57 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01801/97 | 670.42 Jul L-I | Library - 6th Floor | Available |
| |
| LKP : PT Alim Surya Steel (ASS)- Author(s)
- Santoso, Tjokro Widjaya Mulyawan
- ISBN
- -
- Dimension
- viii, 43 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01798/97 | 670.42 San L-I | Library - 6th Floor | Unavailable : Removed |
| |
| LKP : tata letak pabrik PT Tri Anugerah Metalindo Surabaya- Author(s)
- Fatmawati
- ISBN
- -
- Dimension
- xi, 104 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01796/97 | 670.42 Fat L-I | Library - 6th Floor | Unavailable : Removed |
| |
| LKP : aplikasi activity based costing sebagai suatu strategi kompetitif yang handal dalam menetapkan harga jual produk pesanan pada PT "X" di Surabaya- Author(s)
- Halim, Henny Era Herawati
- ISBN
- -
- Dimension
- iv, 57 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01795/97 | 670.42 Hal L-I | Library - 6th Floor | Available |
| |
| LKP : line balancing pada bagian louvre door unit wood working di PT Nusantara Plywood- Author(s)
- Octavia, Tanti
- ISBN
- -
- Dimension
- v, 57 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01794/97 | 670.42 Oct L-I | Library - 6th Floor | Unavailable : Removed |
| |
| LKP : PT Inti Duta Lestari Plastik Surabaya- Author(s)
- Sigit, Harmono
- ISBN
- -
- Dimension
- vi, 82 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01793/97 | 670.42 Sig L-I | Library - 6th Floor | Available |
| |
| LKP : pengendalian kualitas statistik dengan metode peta kontrol dalam proses produksi di PT Logam Jaya- Author(s)
- Hartono, Richard
- ISBN
- -
- Dimension
- vi, 81 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01714/97 | 670.42 Har L-I | Library - 6th Floor | Unavailable : Removed | 2. | 04540/97 | 670.42 Har L-I | - | Unavailable : Lost | 3. | 04916/97 | 670.42 Har L-I | - | Unavailable : Lost | 4. | 05169/97 | 670.42 Har L-I | - | Unavailable : Lost |
| |
| LKP : Pabrik Eternit Hero Malang- Author(s)
- Tjahjadi, Rudi
- ISBN
- -
- Dimension
- vii, 66 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01579/97 | 670.42 Tja L-II | Library - 6th Floor | Available |
| |
| LKP : penerapan material requirement planning di PT Schneider Indonesia-CBF- Author(s)
- Subekti, Titian
- ISBN
- -
- Dimension
- xi, 82 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01576/97 | 670.42 Sib L-I | Library - 6th Floor | Available |
| |
| LKP : pembuatan kampas kopling di PT Valqua Indonesia- Author(s)
- Rizal, Leo
- ISBN
- -
- Dimension
- / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01567/97 | 670.42 Riz L-I | Library - 6th Floor | Available |
| |
| LKP : PT Cahaya Angkasa Abadi Jl. Berbek Industri Waru, Sidoarjo- Author(s)
- Bisono, Robby
- ISBN
- -
- Dimension
- x, 47 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01565/97 | 670.42 Bis L-I | Library - 6th Floor | Available |
| |
| LKP : pengukuran waktu baku dan jumlah operator PT Bali Watch Jl. Brebek Industri, Surabaya- Author(s)
- Julia
- ISBN
- -
- Dimension
- viii, 48 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01489/97 | 670.42 Jul L-I | Library - 6th Floor | Available |
| |
| LKP : ternak ayam petelur "Sumber Urip", Desa Pasarrejo Wonosari-Bondowoso- Author(s)
- Lidiawati
- ISBN
- -
- Dimension
- ix, 31 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01488/97 | 670.42 Lid L-II | Library - 6th Floor | Available |
| |
| LKP: PT Multi Bulagon Makmur- Author(s)
- Sadikin, Yusuf
- ISBN
- -
- Dimension
- vii, 39 p. / 29 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01483/97 | 670.42 Sad L-I | Library - 6th Floor | Available |
| |
| LKP : perancangan dan proses produksi air receiver PT Meco Inoxprima- Author(s)
- Yuliana, Nip Lily
- ISBN
- -
- Dimension
- viii, 105 p. / 30 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 01312/97 | 670.42 Yul L-I | - | Unavailable : Removed |
| |