| Perencanaan produksi perusahaan sepeda- Author(s)
- Ludony, Vitalis
- ISBN
- -
- Dimension
- viii, 76 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00963/00 | 658.5038 Lud P | - | Unavailable : Removed | | 2. | 00964/00 | 658.5038 Lud P | Library - 8th Floor | Available |
| |
| Penjadualan produksi pada PT. Hutama Neala dengan menggunakan algoritma genetika- Author(s)
- Pesireron, Henry Ronaldo
- ISBN
- -
- Dimension
- xi, 123 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00961/00 | 658.53 Pes P | Library - 8th Floor | Unavailable : Removed | | 2. | 00962/00 | 658.53 Pes P | - | Unavailable : Removed |
| |
| Perbaikan pada departemen pengayakan beras di UD. Hari Jaya- Author(s)
- Halim, Imelda Seilia
- ISBN
- -
- Dimension
- xi, 49 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00946/00 | 658.562015195 Hal P | - | Unavailable : Lost | | 2. | 00947/00 | 658.562015195 Hal P | Library - 8th Floor | Unavailable : Removed |
| |
| Pengoptimalan komposisi produksi dengan memaksimumkan laba di PT. Imanuel Jaya- Author(s)
- Dewi, Evi Shinta
- ISBN
- -
- Dimension
- x, 24 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00942/00 | 658.5 Dew P | Library - 8th Floor | Available | | 2. | 00943/00 | 658.5 Dew P | Library - 8th Floor | Unavailable : Removed |
| |
| Kleppner's advertising procedure- Author(s)
- Russell, J. Thomas
- ISBN
- 0139619135
- Dimension
- xviii, 716 p. / 28 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00940/00 | 659.1 Rus K | - | Available |
| |
| Analisa life cycle cost pada gedung manajemen perhotelan Universitas Kristen Petra- Author(s)
- Shiella, Khoe
- ISBN
- -
- Dimension
- vii, 55 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00926/00 | 658.924 Shi A | - | Unavailable : Removed | | 2. | 00927/00 | 658.924 Shi A | - | Unavailable : Removed |
| |
| Perbandingan penyajian laporan keuangan antara konsep entity dengan konsep enterprise pada PT. Prima Alloy Steel Universal Tbk. di Sidoarjo- Author(s)
- Gunawan, Ricky
- ISBN
- -
- Dimension
- ix, 83 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00914/00 | 657.3 Gun P | Library - 8th Floor | Unavailable : Removed | | 2. | 00915/00 | 657.3 Gun P | - | Unavailable : Removed |
| |
| Penerapan akuntansi sumber daya manusia dalam rangka mengakui dan melaporkan cost ssumber daya manusia dengan metode berbasis historical cost pada PT. Semen Gresik di Gresik- Author(s)
- Nelin, Monika
- ISBN
- -
- Dimension
- ix, 75 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00912/00 | 657 Nel P | Library - 8th Floor | Unavailable : Removed | | 2. | 00913/00 | 657 Nel P | - | Unavailable : Removed |
| |
| Optimasi jumlah tenaga kerja dan kapasitas mesin di PT. Sarana Surya Sakti- Author(s)
- Santosa, Agus Chandra
- ISBN
- -
- Dimension
- xviii, 154 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00898/00 | 658.5 San O | Library - 8th Floor | Available |
| |
| Relevansi bank syariah dengan paradigma ekonomi kerakyatan- Author(s)
- Cahyadi, Carolus Wahyu
- ISBN
- -
- Dimension
- ix, 37 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00890/00 | 658.913321 Cah R | Library - 8th Floor | Available | | 2. | 00891/00 | 658.913321 Cah R | - | Unavailable : Removed |
| |
| Perbandingan metode pengendalian proses dengan menggunakan peta kendali X dan M, R dan s- Author(s)
- Nugroho, Septiliana
- ISBN
- -
- Dimension
- xii, 39 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00888/00 | 658.562 Nug P | Library - 8th Floor | Unavailable : Removed | | 2. | 00889/00 | 658.562 Nug P | - | Unavailable : Removed |
| |
| Management- Author(s)
- Schermerhorn, John R.
- ISBN
- 0471029602
- Dimension
- xlvi, 525 p. / 28 cm.
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00883/00 | 658 Sch M | - | Unavailable : Removed | | 2. | 00885/00 | 658 Sch M | - | Unavailable : Removed |
| |
| Hubungan faktor alasan implementasi, kondisi perusahaan dan elemen-elemen penentu dengan proses implentasi ISO 9000- Author(s)
- Tjora, Guido
- ISBN
- -
- Dimension
- x, 66 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00881/00 | 658.562 Tjo H | - | Unavailable : Removed | | 2. | 00884/00 | 658.562 Tjo H | Library - 8th Floor | Unavailable : Removed |
| |
| Perusahaan pengorganisasian pesta konstum- Author(s)
- Chandra, Indrawaty
- ISBN
- -
- Dimension
- vi, 72 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00879/00 | 658 Cha P | - | Unavailable : Removed | | 2. | 00880/00 | 658 Cha P | Library - 8th Floor | Unavailable : Removed |
| |
| Prosedur didstribusi surat kabar dan majalah dengan menentukan jumlah pengiriman yang optimal- Author(s)
- Mayasaputri, Agustini Ika
- ISBN
- -
- Dimension
- xi, 102 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00877/00 | 658.84 May P | - | Unavailable : Lost | | 2. | 00878/00 | 658.84 May P | Library - 8th Floor | Unavailable : Removed |
| |
| Studi tentang peta kendali individu X dan EWMA- Author(s)
- Widura, Hermanto
- ISBN
- -
- Dimension
- xii, 52 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00875/00 | 658.562 Wid S | - | Unavailable : Removed | | 2. | 00876/00 | 658.562 Wid S | Library - 8th Floor | Unavailable : Removed |
| |
| Penerapan konsep fuzzy dalam algoritma genetika untuk penjadualan produksi flowshop- Author(s)
- Alphonso, Alan
- ISBN
- -
- Dimension
- x, 104 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00873/00 | 658.53 Alp P | - | Unavailable : Removed | | 2. | 00874/00 | 658.53 Alp P | Library - 8th Floor | Unavailable : Removed |
| |
| Penerapan metode analytical hierarchy process untuk registrasi ISO 9000 di PT. Sumber Cahaya Hidup- Author(s)
- Ludvie
- ISBN
- -
- Dimension
- ix, 105 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00870/00 | 658.562015195 Lud P | Library - 8th Floor | Unavailable : Removed | | 2. | 00871/00 | 658.562015195 Lud P | - | Unavailable : Removed |
| |
| Optimalisasi jumlah pekerja di rumah sakit ST. Vincentius A. Paulo- Author(s)
- Leani
- ISBN
- -
- Dimension
- ix, 44 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00868/00 | 658.503 Lea O | - | Unavailable : Removed | | 2. | 00869/00 | 658.503 Lea O | - | Unavailable : Removed |
| |
| Peningkatan kualitas maintenance dengan menggunakan statistical process control (SPC)- Author(s)
- Maria, Olivia
- ISBN
- -
- Dimension
- xii, 90 p. / 30 cm
Exemplar(s)| # | Accession No. | Call Number | Location | Status |
|---|
| 1. | 00866/00 | 658.202 Mar P | Library - 8th Floor | Unavailable : Removed | | 2. | 00867/00 | 658.202 Mar P | - | Unavailable : Removed |
| |