Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan metode pert pada proyek gudang
Author
William, Christian
Additional Author(s)
Clanchiu, Cefiro
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21010907/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-69
. Bibliography: p. 46 .
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02790/13
(T) 658.404 Wil S
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Integrated project management
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Analisis hubungan kemitraan dalam mencapai kesuksesan proyek dengan metode sem
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X