Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi pasca implementasi sap pada departemen PPIC PT. X
Author
Sugianto, Jessica
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021713/IND/2013
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
Notes
Appendix: p. 33 - 55
. Bibliography: p. 22.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 55 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00681/14
(T) 658.5 Sug E
Library - 8th Floor
Available
Similar Collection
by author or subject
Perencanaan produksi dengan mempertimbangkan kapasitas produksi pada CV. X
Perbandingan performance anatara algoritma NEH, BaBH dan DPH dengan kriteria minimal Makespan
Analisis fungsi manajemen operasional pada departemen housekeeping G Suites Hotel Surabaya
Perencanaan pengendalian persediaan bahan baku dengan memperhatikan kapasitas gudang di perusahaan sumber jaya
Perancangan sistem manajemen mutu ISO 9001:2000 di PT Dwipa Kharisma Mitra
Analisa produktivitas di CV. Dirgahayu
Inventory control di PT. XYZ
Sistem persediaan suku cadang forklift di PT. Boma Bisma Indra Pasuruan