Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Author
Yonathan, Evan
Additional Author(s)
Kusnadi, Rizky
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011937/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 53 - 87
. Bibliography: p. 52 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01372/14
(T) 658.404 Yon P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor yang mempengaruhi perancangan produk komponen modular untuk rumah tinggal di Surabaya
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Penyiapan sarana untuk evaluasi kemajuan proyek konstruksi
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Project management
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi