Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perencanaan pembangkit listrik tenaga diesel (PLTD) untuk kebutuhan energi listrik di kabupaten Alor
Author
Peni, Orpa Matilda
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Elektro Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01010634/ELK/2014
Subject(s)
DIESEL ELECTRIC POWER PLANTS
ELECTRIC POWER PLANTS
Notes
Appendix: p. 52 - 54
. Bibliography: p. 50 - 51 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02655/14
(T) ELK 0634
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Mengenal dan memahami proses operasi PLTGU
Studi perencanaan pembangkit energi listrik tenaga microhydro pada desa kalangan wirjo RT21/RW1, kecamatan Pujon kabupaten Malang
Studi teknis pengoperasian PLTU 3,9 MW dengan bahan bakar batu bara, serpihan kayu dan potongan veneer di PT. Hendratna Plywood Banjarmasin
LKP : Perusahaan Umum Listrik Negara Proyek Induk Jaringan Jawa Timur dan Bali Surabaya
LKP : penyediaan energi listrik oleh diesel generator (genset) di Apartemen Taman Beverly Surabaya
Studi penerapan PLTD bahan bakar MFO 15MW untuk kelistrikan Desa Lapulu, Kecamatan Lapulu, Kabupaten Kendari, Sulawesi Tenggara
Operasi sistem tenaga listrik
Perencanaan mekanisme pembakit listrik tenaga bobot kendaraan