Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perencanaan pembangkit listrik tenaga diesel (PLTD) untuk kebutuhan energi listrik di kabupaten Alor
Author
Peni, Orpa Matilda
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Elektro Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01010634/ELK/2014
Subject(s)
DIESEL ELECTRIC POWER PLANTS
ELECTRIC POWER PLANTS
Notes
Appendix: p. 52 - 54
. Bibliography: p. 50 - 51 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02655/14
(T) ELK 0634
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : penyediaan energi listrik oleh diesel generator (genset) di Apartemen Taman Beverly Surabaya
Analisa pemodelan PLTA sengguruh dengan Matlab Simulink
Perencanaan mekanisme pembakit listrik tenaga bobot kendaraan
Operasi sistem tenaga listrik
Studi pembangkit energi listrik dengan metode pendulum
Peningkatan unjuk kerja mekanisme alat pembangkit listrik tenaga bobot kendaraan di perlintasan portal area parkir
Studi kinerja PLTA di DAS (Daerah Aliran Sungai) Brantas
Studi penerapan PLTD bahan bakar MFO 15MW untuk kelistrikan Desa Lapulu, Kecamatan Lapulu, Kabupaten Kendari, Sulawesi Tenggara