Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Mengenal dan memahami proses operasi PLTGU : pengalaman dari Gresik
Author
Susanto, Hari
Additional Author(s)
Durrijal, Hadid
Semesta, Lentera
Publisher
Jakarta: Lintang Pancar Semesta, 2009
Language
Indonesian
ISBN
9789791520652
Series
Subject(s)
ELECTRIC POWER PLANTS
STEAM POWER PLANTS
GAS-TURBINES
ELECTRIC POWER SYSTEM
Notes
. .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 122 p.
Dimension
23 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00154/15
621.312132 Sus M
Library - 7th Floor
Available
Similar Collection
by author or subject
Studi simulasi hybrid active filter seri-seri untuk meredam harmonisa pada induction furnace dengan menggunakan program PSIM
LKP : Perusahaan Umum Listrik Negara Proyek Induk Jaringan Jawa Timur dan Bali Surabaya
Studi perencanaan instalasi dan distribusi tenaga listrik di sun city mall Sidoarjo
Evaluasi penggunaan filter harmonisa (kompensator daya reaktif) terhadap sistem kelistrikan di pabrik semen gresik Tuban iii
LKP : PLTU sektor Gresik, Gresik
Optimasi penggunaan bahan bakar pada unit-unit pembangkit dengan menggunakan linier programming
Pembangkit tenaga listrik
Peningkatan unjuk kerja mekanisme alat pembangkit listrik tenaga bobot kendaraan di perlintasan portal area parkir