Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan lembur departemen part, apparel, dan accessoris (PAA) di CV. Roda Lintas Khatulistiwa
Author
Oentoro, Golden Suryajaya
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021824/IND/2015
Subject(s)
PRODUCTION CAPACITY
WORK MEASUREMENT
PRODUCTION MANAGEMENT
Notes
Appendxi: p. 71-78
. Bibliography: p. 70.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 78 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02341/15
(T) IND 1824
-
Unavailable : Removed
Similar Collection
by author or subject
Real process improvement using the CMMI
Pengalokasian operator pada lantai produksi PT X
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
Perencanaan penjadualan pada departemen produksi di PT Integra Indocabinet
How to implement lean manufacturing
Upaya penurunan tingkat kecacatan produk dengan metode DMAIC di PT. X
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Penurunan tingkat kecacatan di PT. Bondi Syad Mulia