Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan dan upaya peningkatan output rate di PT. X
Author
Soegiarto, Gary Limanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021825/IND/2015
Subject(s)
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 77-107
. Bibliography: p. 76.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02394/15
(T) IND 1825
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis dan perancangan perbaikan sistem produksi dan inventori barang jadi di UD Mitra Usaha
Manajemen produksi/operasi
Perbandingan sistem mutu oleh china quality certification (cqc) dengan iso 9001:2000 di PT E-T-A Indonesia
Industrial engineering in the industry 4.0 era
Pengukuran dan upaya peningkatan produktivitas di perusahaan kemasan
Perancangan manajemen energi gedung perkantoran di PT Kerta Rajasa Raya
Penerapan sistem material requirements planning (MRP) sebagai alat untuk meningkatkan efisiensi biaya persediaan bahan baku pada PT. Siantarjaya Ekatama Surabaya
Pemodelan kendali sistem proses regenerasi bed active carbon di pt molindo inti gas menggunakan metode fuzzy inference system