Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan dan upaya peningkatan output rate di PT. X
Author
Soegiarto, Gary Limanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021825/IND/2015
Subject(s)
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 77-107
. Bibliography: p. 76.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02394/15
(T) IND 1825
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan value stream mapping dalam mengidentifikasi waste dan upaya pengurangan waste pada PT X
Evaluasi efisiensi proses produksi sepatu Ardiles Kolonel di PT. Mitra Anugrah
Operations management
LKP: CV Golden Light Driyorejo 179 Gresik
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
Analisa peranan inovasi proses terhadap produktivitas: studi kasus pada PT. Nusa Sastratara Utama Surabaya
Perancangan standard operating procedures di PT. Sepanjang Baut Sejahtera
Upaya penurunan produk cacat dengan siklus DMAIC di PT X