Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan dan upaya peningkatan output rate di PT. X
Author
Soegiarto, Gary Limanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021825/IND/2015
Subject(s)
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 77-107
. Bibliography: p. 76.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02394/15
(T) IND 1825
-
Unavailable : Removed
Similar Collection
by author or subject
Managing the efficient use of materials
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Pengelolaan dan pengembangan usaha beton pada PT. Varia Usaha Beton Waru-Sidoarjo : rencana pengembangan fungsi produksi dan operasi
LKP: New Grand Park Hotel Surabaya
Optimalisasi tenaga kerja pada lini produksi thimonier dan emec-tak 6 di PT Smart Tbk.
Peningkatan produktivitas line spion on assy dengan metode lean manufacturing di PT. FSCM Manufacturing
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
Perencanaan penggunaan base paper pada unit coating dan finishing machine NCR dengan menggunakan program delphi 7.0 di CV Dirgahayu