Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Normalisasi over stock month pada bagian spare part di P.T. X
Author
Tedjakesuma, Arif
Additional Author(s)
-
Publisher
Surabaya: FTI Program Studi Teknik Mesin Program Otomotif Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 04011110/MES/2015
Subject(s)
AUTOMOTIVES-MAINTENANCE AND REPAIR
SPARE PARTS
INVENTORIES--MANAGEMENT
Notes
. Bibliography: p. 144.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 144 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02572/15
(T) MES 1110
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis inventory management pada PT Sarana Lubritama Semesta
Perbaikan sistem pergudangan di PT. X
Penerapan kanban pada sistem inventori PT FSCM Manufacturing Indonesia
Replenishment strategy PCBA in house by improving safety stock at pel plant schneider electric manufacturing Batam
Penurunan reject rate penyok body pada proses assembly dengan metode DMAIC di PT. XYZ
Production stock optimization using base stock level method in pel plant schneider electric manufacturing Batam
Warehouse nervous system to incrase detection capability of abnormality stock in PT Schneider Electric Manufacturing Batam
Penurunan biaya inventori di PT Semb Pel menggunakan metode vendor managed inventory