Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis waktu pekerjaan finishing pada proyek apartemen
Author
Kent, Albert
Additional Author(s)
Phie, Richard Phieter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012076/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 98-111
. Bibliography: p. 97.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/16
(T) SIP 2076
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Quality improvement techniques in construction
Cara pendekatan perhitungan kuantitas pembesian pada kolom struktur beton bertulang
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Studi material Pacitan, Madura dan Pandaan sebagai lapisan permukaan jalan
Analisa quantity take-off dengan menggunakan autodesk revit
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC