Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis waktu pekerjaan finishing pada proyek apartemen
Author
Kent, Albert
Additional Author(s)
Phie, Richard Phieter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012076/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 98-111
. Bibliography: p. 97.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/16
(T) SIP 2076
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Principles of construction management
Sistem penjadwalan LSM untuk proyek instalasi pipa bawah tanah (studi kasus: fuel supply system, proyek pengembangan Bandara Juanda Surabaya)
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender