Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis waktu pekerjaan finishing pada proyek apartemen
Author
Kent, Albert
Additional Author(s)
Phie, Richard Phieter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012076/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 98-111
. Bibliography: p. 97.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/16
(T) SIP 2076
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi material Pacitan, Madura dan Pandaan sebagai lapisan permukaan jalan
Perkembangan real estat citraraya di surabaya
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Infrastructure for the built environment
Kontrol material pada proyek konstruksi perumahan
Sebuah model penjadwalan dan pengendalian material dalam pelaksanaan proyek konstruksi
Analisa perhitungan/kalkulasi pemakaian peralatan & mesin lainnya.
Studi tentang asuransi all risk pada perusahaan konstruksi