Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan waktu pengambilan barang dengan menggunakan simulasi pada gudang sepeda di UD X
Author
Soesatyo, Hendra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021867/IND/2016
Subject(s)
INVENTORIES--MANAGEMENT
WAREHOUSE--MANAGEMENT
TRANSPORTATION-INDUSTRY
Notes
Appendix: p. 56-261
. Bibliography: p. 55 .
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 261 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01019/16
(T) IND 1867
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan manajemen pergudangan plant B di PT. XYZ
External kanban implementation for motion and drives manual book in PT Schneider Electric Manufacturing Batam
Pengurangan jumlah produk setengah jadi di PT. SEMB-PEL
Penerapan value stream mapping dalam mengidentifikasi dan mengurangi waste pada gudang PT. X
Usulan perbaikan sistem pemenuhan dan penyimpanan seragam PT. XYZ
Penerapan kanban pada sistem inventori PT FSCM Manufacturing Indonesia
Perancangan kebijakan pengadaan sepeda dengan pendekatan simulasi dan algoritma evolutionary
Perbaikan manajemen pergudangan pada gudang barang jadi milik PT. FSCM Manufacturing Indonesia