Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Author
Wijaya, Michael Alexander
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021993/IND/2016
Subject(s)
DELIVERY OF GOODS
STANDARD OPERATING PROCEDURE
WORK MEASUREMENT
Notes
Appendix: p. 69-86
. Bibliography: p. 68.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 86 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02537/16
(T) IND 1993
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa pengaruh activity based costing terhadap keunggulan bersaing dan kinerja perusahaan
Perancangan dan pengukuran kinerja perusahaan kaca dengan metode performance prism
Analisis pengaruh supply chain management terhadap keunggulan bersaing dan kinerja perusahaan
Analisis implementasi standard operating procedure di area service bakerzin Ciputra World Surabaya
Perancangan alat bantu dan usulan perbaikan sistem kerja departemen extruder di PT. Kertarajasa Raya Sidoarjo
Pendokumentasian work instruction dan standard operating procedure pada departemen produksi NCR dalam rangka persiapan awal penerapan ISO 9001:2000 serta penerapan SR di perusahaan "X"
Mudah menyusun SOP standard operating procedure
Analisis kinerja tata usaha jurusan di Universitas Kristen Petra berdasarkan konsep Balanced Scorecard dengan perhitungan Data Envelopment Analysis