Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan proses penerimaan spare part dengan menghilangkan peran gudang main store di PT. Y
Author
Halim, Kristina
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021889/IND/2016
Subject(s)
TIME MEASUREMENT
WASTE MINIMIZATION
WAREHOUSES
Notes
Appendix: p; 62-66
. Bibliography: p. 61.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 66 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02559/16
(T) IND 1889
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Pancasurya Jayapratama
Perencanaan produksi dan persediaan di PT. Tirta Bahagia
Minimalisasi bahan baku yang terbuang melalui corong mesin mixer di PT. Charoen Pokphand Indonesia Feedmill Balaraja
Analisa keseimbangan lintasan departemen televisi dan simulasi model di PT. Panggung Electronic Corporation
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Tugas struktrur baja bangunan gudang double gable frame
Pengurangan waste untuk mengurangi waktu proses dan set up pada bagian persiapan PT. Alfa Sarana Insani
Perbaikan pada proses leakage test di PT XYZ dengan mengeliminasi waste