Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
Author
Tipawael, Jeffery
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021998/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 51-58
. Bibliography: p. 50.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02577/16
(T) IND 1998
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Product design and development
Penentuan jumlah tenaga kerja bagian pengepakan kabinet PT X
LKP : analisa tata letak pabrik perusahaan sepatu UD Happy Surabaya
Analisa pengaruh activity based costing terhadap keunggulan bersaing dan kinerja perusahaan
Process improvement using mtm-uas analysis at switch assembly line in schneider electric Indonesia Ltd.
Perencanaan produksi agregat dengan formulasi fuzzy di PT. XYZ
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Improve metal shop process using lean six sigma at PT. Schneider Electric Indonesia