Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penggunaan gaya tekan terbatas untuk meningkatkan daya dukung point bearing suatu pondasi tiang
Advances in designing and testing deep foundations
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Drilled pier foundations
Pengaruh sudut "tapered pile" terhadap peningkatan daya dukungnya
Evaluasi rumusan daya dukung lateral pada tiang pancang tegak terhadap test pembebanan
Program komputer untuk analisa kapasitas dukung tiang pancang tunggal dengan metode load transfer (T-Z)
Studi mengenai friksi antara tiang dan beberapa jenis tanah lempung yang dipengaruhi oleh kadar air, waktu, dan jenis material