Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pondasi tiang cor tempat dengan sistem tekan bertahap
Diagram beban penurunan pada pondasi tiang secara teoritis
Pergerakan tanah lateral akibat proses pemancangan tiang
The design of piled foundations
Dasar-dasar pemikiran penggunaan pondasi tiang dan jenis-jenis pondasi tiang
LKP : pembangunan/pembenahan areal Tugu Pahlawan
Penggunaan pondasi tiang dan preloading untuk mengatasi masalah penurunan dari suatu bangunan
Penyebaran kuat tekan beton pada penampang spun pile