Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan tanah dengan menggunakan kumpulan kantong-kantong pasir
Vibroflotation
Limit design of pile foundations
Interaksi pelat dengan susunan tiang terhadap daya dukung dan penurunan pondasi
Validasi rumus-rumus daya dukung tiang pancang berdasarkan uji langsung di lapangan
Efisiensi waktu pemancangan tiang pancang pada proyek 'X'
Penggunaan stone column pada teknik sipil
Penggunaan data pile driving log sebagai data geoteknik di proyek apartement waterplace pakuwon Surabaya