Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
A theory for skin fiction on piles
Faktor-faktor yang mempengaruhi produktifitas pemancangan tiang tekan
Perkiraan daya dukung tiang pancang berdasarkan rumus dinamis
Diagram beban penurunan pada pondasi tiang secara teoritis
Optimasi perencanaan pondasi tiang pancang tunggal berdasarkan kapasitas dukung dan volume bahan
Short course on soil and rock improvement, techniques including geotextiles, reinforced earth and modern piling methods
Metode peningkatan daya dukung tiang dengan menggunakan pemisahan end bearing (qb) dan friction (qs) dam bulp dengan kapasitas dongkrak terbatas
The settlement of friction pile foundations