Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh sudut "tapered pile" terhadap peningkatan daya dukungnya
Model galat kapasitas daya dukung axial pondasi tiang pancang tunggal secara dinamis
Pengaruh waktu pra-pembebanan pada pelat dari pondasi tiang terhadap daya dukung pelat-tiang secara keseluruhan
Studi negative skin friction pada model tiang pondasi
Model galat kapasitas daya dukung axial pondasi tiang pancang tunggal secara dinamis
Penggunaan gaya tekan terbatas untuk meningkatkan daya dukung point bearing suatu pondasi tiang
Analisis produktivitas pekerjaan pondasi bored pile (studi kasus pada bangunan perkantoran 31 lantai)
Prediksi gaya tekan jacked pile saat pelaksanaan dengan menggunakan data Nspt