Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas dan keterlambatan produksi tiang pancang dan tiang listrik pada perusahaan "X" dengan MPDM
Author
Lukito, Alvin Jayadinata
Additional Author(s)
Ardianto, Leonard Frans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 021012117/SIP/2016
Subject(s)
COSTRUCTION INDUSTRY-MANAGEMENT
PILING (CIVIL ENGINEERING)
PILING
Notes
Appendix: p. 73-75
. Bibliography: p. 71-72 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02649/16
(T) SIP 2117
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh bulb terhadap daya dukung tiang dengan menggunakan sistem jacking
Studi kasus perbandingan hasil pengujian pondasi tiang pancang secara dinamis dan statnamic terhadap statis
Penelitian downdrag force (negative skin friction) pada kelompok tiang pancang secara model
Produktivitas pemancangan tiang tekan pada bangunan apartemen
Estimasi beban ultimate tiang pancang dari loading test tak sampai hancur
Program komputer untuk analisa kapasitas dukung tiang pancang tunggal dengan metode load transfer (T-Z)
Piling engineering
Optimasi perencanaan pondasi tiang pancang tunggal berdasarkan kapasitas dukung dan volume bahan