Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Author
Wijaya, Ongky Alexander
Additional Author(s)
Tendean, Ariel Benso
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012113/IP/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 49.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 49 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02778/16
(T) SIP 2113
Library - 8th Floor
Available
Similar Collection
by author or subject
Kajian metode takt time pada proyek konstruksi
Construction management
Penerapan analisa EVA pada perusahaan konstruksi
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Analisa pengambilan keputusan pada perusahaan realestat menghadapi masa krisis
Proyek Sekolah Kristen Gloria Surabaya
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Penggunaan penyelesaian sengketa pada proyek konstruksi