Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Author
Wijaya, Ongky Alexander
Additional Author(s)
Tendean, Ariel Benso
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012113/IP/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 49.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 49 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02778/16
(T) SIP 2113
Library - 8th Floor
Available
Similar Collection
by author or subject
Construction project planning and scheduling
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Manajemen proyek
Pengaruh kualitas layanan purna jual terhadap kepuasan dan loyalitas konsumen rumah menengah atas di Surabaya
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
CPM in construction management