Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model proyeksi dan optimalisasi cash flow multi proyek terintegrasi
Author
Irpiena, Resela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000224/MTS/2017
Subject(s)
CASH FLOW
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
. Bibliography: p. 106-108 .
Abstract
-
Physical Dimension
Number of Page(s)
xi, 108 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02149/17
(T2) MTS 0224
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor penghambat kontraktror untuk melaksanakan k3 pada proyek konstruksi
Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Pandangan kontraktor terhadap klausul-klausul kontrak pada proyek konstruksi
Capital budgeting
Pengaruh kinerja corporate social responsibility (CSR) terhadap persistensi laba pada perusahaan yang bergerak di sektor industri dasar dan kimia di Indonesia
Pengelolaan kas dalam rangka efisiensi penggunaan dana pada perusahaan genteng "X" di Surabaya
Evaluasi sistem manajemen k3 terhadap metode pemancangan jack-in pile
Analisa pengaruh strategic purchasing terhadap kinerja proyek melalui kemitraan, integrasi dengan pemasok dan kolaborasi pada perusahaan kontraktor utama di Surabaya