Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor
Author
Darwin
Additional Author(s)
Wijaya, Hermawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012185/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 49-54
. Bibliography: p. 47-48 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02662/17
(T) SIP 2185
Library - 8th Floor
Available
Similar Collection
by author or subject
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi
Analisis faktor-faktor yang mempengaruhi perpindahan pelaksana tetap pada perusahaan kontraktor di Surabaya
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Analisa teori value chain terhadap kompetensi pada perusahaan kontraktor kelas a di Surabaya
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya