Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan perawatan mesin paku di PT. Prima Waru Industri
Author
Langi, Ian Ivan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 02022098/IND?2017
Subject(s)
INDUSTRIAL EQUIPMENT--MAINTENANCE AND REPAIR
MACHINER-MAINTENANCE AND REPAIR
PLANT MAINTENANCE
Notes
Appendix: p. 37-58
. Bibliography: p. 36.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 58 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02812/17
(T) IND 2098
Library - 8th Floor
Available
Similar Collection
by author or subject
Perancangan jadwal preventive maintenance pada segmen produksi plastik PT. ETA
Sistem pengendalian persediaan suku cadang di PT. Romos Inti Cosmetic
Perencanaan total productive maintenance di unit pembuatan mesin pengupas gabah tipe HC 6 BV PT. Agrindo
Perencanaan penerapan reability centered maintenace (RCM) di PT. Kertarajasa Raya
Penjadwalan perawatan mesin-mesin produksi di PT. Alam Kayu Sakti
Industrial mechanics and maintenance
Managing maintenance error
Penentuan jadwal preventive maintenance mesin packaging di PT Sido Muncul