Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Author
Vernatha, Jemmy
Additional Author(s)
Eldad, Shamgar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012173/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
SCHEDULING
PROJECT MANAGEMENT
Notes
Appendix: p. 49-53
. Bibliography: p. 47-48 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01775/18
(T) SIP 2173
-
Unavailable : Removed
Similar Collection
by author or subject
Aspek-aspek manajemen usaha
Computer-based construction project management
8th International Conference on Engineering, Project, and Product Management (EPPM 2017)
Faktor-faktor yang menentukan perencanaan strategik dalam perusahaan kontraktor
Pengaruh motivasi dan disiplin kerja terhadap produktivitas pekerja pada proyek X
Penentuan rute dan penjadwalan kendaraan untuk pengiriman spon di CV. Prima Maju Jaya
Manajemen proyek konstruksi
Radical project management