Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Author
Vernatha, Jemmy
Additional Author(s)
Eldad, Shamgar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012173/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
SCHEDULING
PROJECT MANAGEMENT
Notes
Appendix: p. 49-53
. Bibliography: p. 47-48 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01775/18
(T) SIP 2173
-
Unavailable : Removed
Similar Collection
by author or subject
Penelitian awal tentang sisa material konstruksi pada perusahaan kontraktor di Surabaya
Analisa frekuensi dan besaran nilai change order serta faktor penyebabnya pada pekerjaan konstruksi bangunan tinggi
Last planner system terhadap performa proyek konstruksi
Studi tentang faktor-faktor penentu dalam pemilihan jenis kontrak untuk proyek konstruksi
Strategi perusahaan konstruksi di Surabaya di era krisis
Engineering construction risks
Pandangan kontraktor terhadap klausul-klausul kontrak pada proyek konstruksi
Penerapan approximate cost estimate pada struktur beton bertulang bangunan ruko (SOHO)