Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Author
Vernatha, Jemmy
Additional Author(s)
Eldad, Shamgar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012173/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
SCHEDULING
PROJECT MANAGEMENT
Notes
Appendix: p. 49-53
. Bibliography: p. 47-48 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01775/18
(T) SIP 2173
-
Unavailable : Removed
Similar Collection
by author or subject
Project management in construction
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Construction project planning and scheduling
Studi penerapan manajemen rantai pasok pengadaan material proyek konstruksi
Analisa sistem perlindungan jatuh pada proyek konstruksi di Surabaya
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Model bobot aktivitas sebagai dasar pendistribusian float
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya