Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
Author
Frenatta, Jason Dio
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022137/IND/2018
Subject(s)
INDUSTRIAL PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 79-84
. Bibliography: p. 78.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03338/18
(T) IND 01-2137
Library - 8th Floor
Available
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Operations and supply management
Perancangan sistem kanban pada line machining yoke di PT. Inti Ganda Perdana
Operasi
MES compendium
LKP : PT Djajanti Universal Gresik
The handbook of design management
Advances in ergonomics of manufacturing: managing the enterprise of the future