Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
Author
Frenatta, Jason Dio
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022137/IND/2018
Subject(s)
INDUSTRIAL PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 79-84
. Bibliography: p. 78.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03338/18
(T) IND 01-2137
Library - 8th Floor
Available
Similar Collection
by author or subject
Optimalisasi tenaga kerja pada lini produksi thimonier dan emec-tak 6 di PT Smart Tbk.
Poter (potato burger)
Perancangan agenda operator dan perbaikan modul development sebagai tools dalam pencapaian HPWT di PT X
Analisa biaya kualitas di PT. "X"
Perancangan quality plan di CV X Sidoarjo
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Pengurangan tingkat kecacatan dengan metode CCC-r di PT. Djarum secondary
Funkidz rice box