Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
Author
Frenatta, Jason Dio
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022137/IND/2018
Subject(s)
INDUSTRIAL PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 79-84
. Bibliography: p. 78.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03338/18
(T) IND 01-2137
Library - 8th Floor
Available
Similar Collection
by author or subject
Upaya penurunan internal claim dengan metode DMAIC di PT. E-T-A Indonesia
LKP : PT Djajanti Universal Gresik
Sustainable logistics and supply chains
Perancangan sistem perencanaan dan pengendalian produksi di CV. Olympic Makmur Jaya
Analisis sistem dan proses produksi pengisian botol di PT Coca Cola Tirtalina Bootling Company
Peranan inovasi dalam rangka meningkatkan kinerja perusahaan: studi kasus di PT. Gatra Mapan
Analisa perencanaan dan pengawasan sistem produksi pada perusahaan manufaktur tas "X" di Surabaya
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo