Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : Boma Bisma Indra
Author
Winarto, Susanto
Additional Author(s)
-
Publisher
Surabaya: 1993
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Mekanik
Subject(s)
DIESEL MOTOR INDUSTRY
MANUFACTURING PROCESSES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix,83p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02843/93
L 621.3 Win L/M
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Universal Centraltronik Surabaya
LKP : PT (Persero) angkasa pura I bandara udara juanda
Perencanaan dan pembuatan pulse electric and thermotherapy untuk mengatasi gangguan rheumatism arthritis dengan microcontroller 8031
Principles of manufacturing materials and processes
LKP : PT Ganda Wangsa Utama
Perencanaan kebutuhan bahan baku dan pemilihan supplier di PT. Indonesia multi Colour Printing
LKP : CV Lambang Jaya Malang
Analisis kemampuan proses produksi karung plastik di PT Kerta Rajasa Raya