Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : CV Sumber Baru Semarang
Author
Kusuma, Pranata
Additional Author(s)
-
Publisher
Surabaya: 1993
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik I
Subject(s)
ELECTRIC GENERATORS
ELECTRIC MOTORS, ALTERNATING CURRENT
ELECTRIC MOTORS, DIRECT CURRENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii,54p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05259/93
L 621.3 Kus L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Sidokumpul Raya Gresik
Perencanaan dan pembuatan automatic voltage stabilizer 3 phasa (3x1000VA), 50 HZ, 220/380V menggunakan mikro kontroller 8031 dengan proteksi overload dan open phasaa
LKP : pembangkit listrik gedung fakultas teknik Universitas Kristen Petra Surabaya
Simulasi pembangkit listrik dengan penggerak motor magnet permanen
Perencanaan dan pembuatan pengendali motor DC 1/8 HP 180 V, berbasis jaringan saraf tiruan propagasi balik
Dasar tenaga listrik
Perencanaan mekanisme pembakit listrik tenaga bobot kendaraan
Studi tentang pembagian beban pada generator set (2 x 1,25 mva) di Tunjungan Plaza II