Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Program p3-tc untuk perhitungan waktu efektif penggunaan tower crane pada konstruksi bangunan bertingkat
Author
Sanjaya, Budi
Additional Author(s)
Poernawan, David Pauli
Publisher
Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20131401/SIP/2004
Subject(s)
MATERIALS MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00277/05
(T) - 658.924 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya
Construction management
Perancangan program pemilihan kontraktor pemenang dalam proses tender pada proyek perumahan di Surabaya
Safety rules and procedures development and implementation
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Culture and workplace behaviors: A case study of joint venture construction projects in Thailand
Studi joint risk management pada proyek konstruksi di Surabaya
Evaluasi kinerja bangunan dengan ketidakberaturan sudut dalam yang direncanakan secara direct displacement based design