Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa penyebab utama change order pada proyek konstruksi gedung t Universitas Kristen Petra Surabaya
Author
Eriana, Joice
Additional Author(s)
Wijaya, Peter Kurnia
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121396/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 65 - 105
Bibliography: p. 63 - 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 105 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00769/05
(T) - 658.404 Eri A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa penyebab utama change order pada proyek konstruksi gedung t universitas kristen petra Surabaya
Analisa change order dalam proyek konstruksi
Project evaluation and procurement case studies
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Evaluasi kinerja perusahaan konstruksi, developer, dan trading berdasarkan profitability, kualitas aset, efisiensi perusahaan, resiko, serta kesehatan modal kerja perusahaan
Construction scheduling and control
Survei tentang pengembangan ruko berdasarkan fungsi dan tantangannya bagi pengembang ruko di surabaya
Studi kelayakan pada suatu Pusat Pembelanjaan "X3" di Surabaya