Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa penyebab utama change order pada proyek konstruksi gedung t Universitas Kristen Petra Surabaya
Author
Eriana, Joice
Additional Author(s)
Wijaya, Peter Kurnia
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121396/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 65 - 105
Bibliography: p. 63 - 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 105 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00769/05
(T) - 658.404 Eri A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa penyebab utama change order pada proyek konstruksi gedung t universitas kristen petra Surabaya
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Studi kelayakan investasi proyek pergudangan. Studi kasus: kompleks pergudangan di Sidoarjo
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
Efek material pengisi kalsium karbonat dan waste marble dust terhadap sifat mekanik mortar
Common sense project management
Studi kelayakan bisnis
Building information modeling (BIM) : teknologi, manfaat dan kendala dalam dunia konstruksi di Surabaya