Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pemodelan kendali sistem proses regenerasi bed active carbon di pt molindo inti gas menggunakan metode fuzzy inference system
Author
Kurniawati, Mia Dewi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010901/IND/2005
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 72 - 155
Bibliography: p. 71
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01577/05
(T) - 658.562 Kur P
Library - 8th Floor
Available
Similar Collection
by author or subject
Upaya peningkatan pencapaian target produksi di pt. Samador Intiperoksida
LKP: analisa 4P (product, price, place, promotion) hotel Satelit Surabaya, jln. Mayjen Sungkono 139 Surabaya
Perancangan sistem pengendalian kualitas pada proses packaging margarine plant di PT Smart, Tbk
Analisa kepuasan konsumen di sekolah musik
Pengoptimalan keuntungan dengan implementasi theory of constraints (TOC) di Bengkel Nenggala Satria Surabaya
Upaya pencapaian target produksi di PT. Nayati Indonesia
Preventive action untuk peningkatan kualitas lampu VTL pada end process quality control di PT Philips Indonesia
Analisa pengurangan kecacatan pada produk asphalt cutting di PT Berkat Anugerah Jaya