Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pemodelan kendali sistem proses regenerasi bed active carbon di pt molindo inti gas menggunakan metode fuzzy inference system
Author
Kurniawati, Mia Dewi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010901/IND/2005
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 72 - 155
Bibliography: p. 71
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01577/05
(T) - 658.562 Kur P
Library - 8th Floor
Available
Similar Collection
by author or subject
LKP : UD Cipta Jaya
Operations management
Analisa produktivitas produksi drum pt inti pelangi drumasindo
Perbaikan tata letak pabrik koper dengan meminimalkan material handling pada lantai produksi
Pengukuran dan upaya peningkatan produktivitas di perusahaan kemasan
Perbandingan antara QFD klasik dengan QFD fuzzy dengan studi kasus di PT Bank Central Asia
Pengurangan tingkat kecacatan dengan metode CCC-r di PT. Djarum secondary
Perbaikan mutu proses pengisian air ke dalam botol di PT Tirtamas Megah