Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Author
Gunawan, Jugo Priyo Rusdi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040958/IND/2005
Subject(s)
SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 171 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00538/06
(T) - 658.53 Gun P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem pengukuran dan peningkatan kinerja perusahaan di PT. Multipack Unggul
Penjadwalan tenaga paramedis perawatan di rumah sakit katolik st. vincentius a. paulo dengan bayesian optimization algorithm
Perancangan sistem manajemen mutu iso 9001:2000 di PT Jaya Garmen Sukses Makmur
Penentuan reward di PT Fuboru Indonesia
Peningkatan produktivitas dengan metode lean manufacturing di PT. FSCM Manufacturing
Perancangan tata letak fasilitas dan sistem inventory untuk meningkatkan kapasitas produksi pada departemen Carpenter PT Trias Sentosa, Tbk
ERP
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur