Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Author
Gunawan, Jugo Priyo Rusdi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040958/IND/2005
Subject(s)
SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 171 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00538/06
(T) - 658.53 Gun P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengoptimalan rute & jadwal rutin kendaraan di PT Gunung Arta Manunggal
Operations management in the supply chain
Analisa kualitas pengerjaan produk penta floor epoxy pada PT. Bina Adidaya di Surabaya
Perancangan peningkatan kapasitas produksi di PT. XYZ
Perencanaan penjadualan pada departemen produksi di PT Integra Indocabinet
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor perbankan dan asuransi di Surabaya
Penjadwalan job di PT X dengan metode hybrid genetic algorithm untuk meminimasi makespan
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X