Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Author
Gunawan, Jugo Priyo Rusdi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040958/IND/2005
Subject(s)
SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 171 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00538/06
(T) - 658.53 Gun P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan keseimbangan lintasan produksi dalam upaya meminimasi waktu menganggur di PT Djajanti Universal, Gresik
Analisis penerapan standard operational procedure dalam proses produksi pada PT Pertiwimas Adi Kencana
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
Product strategy and management
Penentuan pergantian mata pisau potong pada mesin extruder besar line 40 dengan pendekatan simulasi di PT X
Computational intelligence in design and manufacturing
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Analisa jumlah kebutuhan tenaga kerja di PT Mitra Mulia Makmur