Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Author
Gunawan, Jugo Priyo Rusdi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040958/IND/2005
Subject(s)
SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 171 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00538/06
(T) - 658.53 Gun P
-
Unavailable : Removed
Similar Collection
by author or subject
The Breeden realty office building construction schedule
Lean performance ERP project management
Upaya pencapaian target kapasitas produksi di line assembling western divisi gas PT Nayati Indonesia
Operations management
The User's journey
Brand babble
LKP : peramalan permintaan data perencanaan tata letak pabrik di Perusahaan Sohun Surya Jaya
Pengoptimalan bahan baku untuk produksi bola dengan metode experiment design di PT. Asia Pramulia