Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Author
Lini, Mei Siu
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040997/IND/2005
Subject(s)
PRODUCTION PLANNING
SCHEDULING
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 178 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00527/06
(T) - 658.53 Lin P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa kinerja manufacturing resource planning (MRP II) untuk produk filamen dan anchor di PT. Cahaya Angkasa Abadi
Production and inventory management
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia
Analisa perbandingan produktivitas proses manual dengan proses progresif di PT Fuboru Indonesia
Algoritma branch and bound dan algoritma genetika untuk penjadwalan flowshop dengan fungsi tujuan ganda
Perancangan sistem aliran informasi dan barang untuk mengurangi lead time di PT X
Penurunan tingkat kecacatan dan analisa biaya rework di CV Asia Maju
Quality planning and analysis