Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem produksi toyota : suatu ancangan terpadu untuk penerapan just-in-time volume 2 cet. 2
Author
Monden, Yasuhiro
Additional Author(s)
Nugroho, Edi
Publisher
Jakarta: Penerbit PPM, 2000
Language
Indonesian
ISBN
9794420301
Series
Seri manajemen operasi 8
Subject(s)
PRODUCTION MANAGEMENT
Notes
Bibliography: p. 187 - 200. Index: p. 201 - 202
Abstract
-
Physical Dimension
Number of Page(s)
xix, 202 p.
Dimension
24 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00621/06
- 658.5 Mon S-II
Library - 7th Floor
Available
Similar Collection
by author or subject
Sistem produksi toyota
Operations management
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X
Upaya penurunan downtime line assembly dengan mengevaluasi sistem total productive maintenance pada PT. XYZ
Analisis produktivitas hollowframe di PT. Mulcindo
Operations management
Studi tentang pengukuran kinerja proses dan evaluasi inventasi in-mould-closing-device
Penentuan jumlah tenaga kerja yang optimal di perusahaan jangkar dengan metode linear programming