Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan data harga satuan pekerjaan untuk estimasi biaya pekerjaan konstruksi baja
Author
Gunawan, Tanto
Additional Author(s)
Stephanus, Nico
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21401462/SIP/2006
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 133 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01490/06
(T) - 692.5 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Optimalisasi sistem tata cahaya buatan studi kasus: ruang rawat inap RS. Spesialis Husada Utama Surabaya
Legalitas redesign dan shop drawing oleh kontraktor
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Analisa progress pekerjaan finishing pada proyek apartemen
Model pengaruh faktor laten terhadap perilaku pekerja pada cacat konstruksi
Analisis bangunan menghitung anggaran biaya bangunan
Perbandingan kinerja bangunan yang didesain dengan force-based design dan direct displacement-based design menggunakan SNI gempa 2012