Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Author
Runtukahu, Sherrin
Additional Author(s)
Andika D.W.
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041015/IND/2005
Subject(s)
PRODUCTION CONTROL
TIME STUDY
WORK MEASUREMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 415 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01653/06
(T) - 658.542 Run A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan metode pengukuran kinerja jurusan teknik industri Universitas Kristen Petra berdasarkan kriteria MBNQA
Perencanaan produksi dan kebutuhan bahan baku di cv 'X'
Upaya penurunan downtime pada mesin winding di PT. Lotus Indah Textile Industries Surabaya
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Peningkatan performa metode kerja adm pro msp pricing pada PT Toyota Motor Manufacturing Indonesia
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
LKP : proses produksi di PT Megasurya Mas
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya