Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : Sistematis perawatan generator 6,6 kV PLTA Selorejo
Author
Cristianto, Deddy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2004
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek
Subject(s)
ELECTRIC ENGINEERING
ELECTRIC GENERATORS
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
x, 98 p.
Dimension
30 cm.
Other Desc.
Ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02206/06
L - 621.3 Cri L/s
Library - 6th Floor
Available
Similar Collection
by author or subject
Studi motorpact fvnr 7.2 kv di pt. schneider Indonesia
Electricity and electronics
Perencanaan mekanisme pembakit listrik tenaga bobot kendaraan
LKP : Komunikasi antara PLC twido, power meter, dan touch screen vijeo designer di PT. Schneider Electric Indonesia Jakarta
Industrial power distribution and illuminating systems
LKP : Indikator radar cuaca pada pesawat terbang primus-90 WXD tipe digital indikator DI-9001 Merpati maintenance facility PT. Merpati Nusantra Airlines
Basic electrical engineering
Studi tentang pengoperasian boiler turbine generator 1X5170 kw di PT. Sasa Inti Gending Probolinggo