Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya pencapaian target kapasitas produksi di line assembling western divisi gas PT Nayati Indonesia
Author
Adiatma, Maria Listia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01041113/IND/2006
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
QUALITY CONTROL
Notes
Appendix: p. 73-91
Bibliography: p. 72
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 91 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04773/06
(T) - 658.562 Adi U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengantar teknik industri
Analisa supplier quality assurance manual di PT. FSCM Manufacturing Indonesia
Usulan perbaikan sistem kerja dan perancangan fasilitas kerja dengan pendekatan ergonomi di PT Balifoam Nusa Megah
Analisa Produktivitas di PT. Japfa Comfeed Indonesia, Tbk.
Peningkatan kualitas dengan pemberian insentif pada pekerja borongan di pt "x".
Studi tentang vehicle routing problem with time windows (vrptw) dengan menggunakan metode simulated annealing
Penurunan tingkat kecacatan dan analisa biaya rework di CV Asia Maju
Perancangan sistem pengendalian kualitas di PT Bondy Syad Mulia