Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara kepemimpinan manajer proyek dengan kepercayaan pada proyek konstruksi
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Cara pendekatan perhitungan kuantitas pembesian pada pelat lantai struktur beton bertulang
Perbandingan sisa material antara dinding bata konvensional dengan dinding bata ringan pada proyek perumahan
Contractor's management handbook
Elemen segitiga berbasis kriging dengan tegangan kontinu pada titik nodal
Studi literatur tentang penataan site pada proyek konstruksi bangunan tingkat tinggi
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya