Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Computer-based construction project management
Analisis perlakuan akuntansi pada perusahaan jasa konstruksi
Construction project planning and scheduling
Analisa pasar student apartment di Surabaya
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Faktor-faktor yang mempengaruhi keputusan pembelian rumah dan apartemen kelas menegah bawah di Surabaya, Gresik, dan Sidoarjo