Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Etika bisnis konstruksi
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Model pengaruh iklim keselamatan terhadap perilaku keselamatan dengan determinan pengetahuan dan motivasi pada proyek konstruksi
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Penerapan quality function deployment dalam bidang konstruksi
Manajemen risiko pada kecelakaan kerja di proyek konstruksi
Theory of constraints dalam manajemen konstruksi khususnya di bidang pelaksanaan pembangunan perumahan di Surabaya