Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Studi kasus mengenai aspek-aspek constructability pada suatu proyek apartemen
Penyiapan data harga satuan pekerjaan untuk estimasi biaya pekerjaan konstruksi baja
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Perubahan harga BBM terhadap biaya konstruksi rumah sehat sederhana (RSH)
Value engineering project report
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya
Manajemen proyek konstruksi