Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Elemen segitiga berbasis kriging dengan tegangan kontinu pada titik nodal
Manajemen proyek konstruksi
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Manajemen proyek konstruksi
Faktor-faktor yang mempengaruhi keputusan pembelian rumah dan apartemen kelas menegah bawah di Surabaya, Gresik, dan Sidoarjo
Analisa kendala pelaksanaan e-procurement di kota Surabaya