Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penerapan prinsip-prinsip constructability pada proyek konstruksi di Surabaya
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Studi kasus mengenai aspek-aspek constructability pada suatu proyek apartemen
Construction planning, programming and control
Manajemen risiko pada kecelakaan kerja di proyek konstruksi
Metode gabungan critical path method dan line of balance dan penerapannya pada proyek perumahan yang berulang
Evaluasi sistem pengendalian biaya proyek pada perusahaan jasa konstruksi berskala besar di Surabaya
Analisa faktor kepuasan penghuni apartemen menengah bawah di Surabaya