Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penelitian dampak dari sumber daya dan strategi pada performa perusahaan konstruksi
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi