Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Author
Yulistyoputro, Edwin
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000090/MTS/2006
Subject(s)
MATHEMATICAL MODELS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 70 - 166
Bibliography: p. 68 - 69
Abstract
-
Physical Dimension
Number of Page(s)
xi, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07451/06
(T2) - 658.503 Yul M
-
Unavailable : Removed
Similar Collection
by author or subject
Pengurangan tingkat kecacatan dengan metode CCC-r di PT. Djarum secondary
Perancangan jadwal maintenance dalam rangka aplikasi total productive maintenance (TPM) di PT Agrindo
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Product Lifecycle Management (Volume 3): The Executive Summary
Penentuan umur mata pisau potong mesin extruder kecil dengan pendekatan simulasi di PT X
LKP : PG Rejo Agung Baru Madiun
Meminimalkan waste pada departemen secondary processing PT. X dengan menggunakan DMAIC
Stability analysis of Markovian jump systems