Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Author
Yulistyoputro, Edwin
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000090/MTS/2006
Subject(s)
MATHEMATICAL MODELS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 70 - 166
Bibliography: p. 68 - 69
Abstract
-
Physical Dimension
Number of Page(s)
xi, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07451/06
(T2) - 658.503 Yul M
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : UD Cipta Jaya
Peningkatan kapasitas produksi pada PT. Adicitra Bhirawa
Penentuan waktu output baku dan analisa perhitungan kapasitas output baku produksi unit 3 pt. panggung electric corporation (pec) surabaya
Analisa penurunan hambatan mesin flexo di PT Lestari Karya Makmur
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Upaya penurunan downtime pada mesin moulding di PT. X
Peningkatan produktivitas di perusahaan kaleng Sinar Abadi
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia