Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Author
Yulistyoputro, Edwin
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000090/MTS/2006
Subject(s)
MATHEMATICAL MODELS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 70 - 166
Bibliography: p. 68 - 69
Abstract
-
Physical Dimension
Number of Page(s)
xi, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07451/06
(T2) - 658.503 Yul M
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa output produksi pipa GTE (Galvanized Threading End) pada proses threading di PT Spindo unit III
Pengaruh komitmen top manajemen terhadap kinerja proyek melalui kemampuan tim proyek dan desain proyek
Advertising and promotion
Tantangan industri manufaktur
Experimentation methodology for engineers
Penilaian dan perbaikan kinerja supply chain management dan simulasi kebijakan di PT. X
Pengoptimalan rute & jadwal rutin kendaraan di PT Gunung Arta Manunggal
Mathematical analysis of continuum mechanics and industrial applications II