Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi quick changeover di PT. X
Author
Andreas, Edo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010784/MES/2007
Subject(s)
ASSEMBLY-LINE METHODS
MACHINE-TOOLS
MANUFACTURING PROCESS
Notes
Appendix: p. 44 - 61
Bibliography: p. 43
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 61 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00829/07
(T) - 670.427 And I
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : di PT IONUDA
LKP : di PT Bhirawa Steel Surabaya
Analisa faktor daya kembang dan daya serap krupuk dengan metode topsis
LKP : PT Gunawan Dianjaya Steel
Mastering lean product development
LKP : di CV Lambang Jaya ; mesin pengering kapulaga
LKP : PT Limbert Sakti Surabaya
LKP : Bengkel Halim Bersaudara Pandaan