Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi quick changeover di PT. X
Author
Andreas, Edo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010784/MES/2007
Subject(s)
ASSEMBLY-LINE METHODS
MACHINE-TOOLS
MANUFACTURING PROCESS
Notes
Appendix: p. 44 - 61
Bibliography: p. 43
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 61 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00829/07
(T) - 670.427 And I
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Meco Inoxprima Surabaya
A Revolution in manufacturing
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Perencanaan fixture sebagai pendukung proses pemesinan cover gear box HC 600
LKP : PD Aneka Jasa dan Permesinan unit-VII Barada Kirana Surabaya
RSX production line analysis with line architecture design methodology in PT. Schneider Electric Manufacturing Batam
LKP : Bengkel Tjokro Bersaudara Surabaya