Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Author
Pranoto, Obed Antonio
Additional Author(s)
Gunawan, Fendy Peter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21121514/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 167
Bibliography: p. 105
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 167 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00883/07
(T) - 658.404 Pra S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa percepatan durasi aktivitas sebagai antisipasi keterlambatan proyek
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Analisa produktivitas pekerjaan bekisting dan pembesian pada beberapa bagian struktur bagian atas
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Survei kepuasan pengguna ruko terhadap jasa broker properti Surabaya
CPM in construction management
Usulan penggunaan short interval planning pada proyek konstruksi