Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Author
Pranoto, Obed Antonio
Additional Author(s)
Gunawan, Fendy Peter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21121514/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 167
Bibliography: p. 105
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 167 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00883/07
(T) - 658.404 Pra S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Studi kelayakan salon mobil di Banjarmasin ditinjau dari aspek pasar, teknis, manajemen, dan keuangan
Planning, performing, and controlling projects
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Evaluasi studi kelayakan aspek keuangan proyek pusat perbelanjaan megamall Manado
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...