Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Author
Pranoto, Obed Antonio
Additional Author(s)
Gunawan, Fendy Peter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21121514/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 167
Bibliography: p. 105
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 167 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00883/07
(T) - 658.404 Pra S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Studi tentang produktivitas pekerjaan pasangan dinding setengah bata lantai dua pada proyek perumahan
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Pengukuran tingkat motivasi dan demotivasi pekerja konstruksi pada suatu proyek di Surabaya
Analisis sistem manajemen lingkungan (ISO 14000) dan kemungkinan implementasinya oleh para kontraktor kelas A di Surabaya
Contractor's management handbook