Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Author
Pranoto, Obed Antonio
Additional Author(s)
Gunawan, Fendy Peter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21121514/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 167
Bibliography: p. 105
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 167 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00883/07
(T) - 658.404 Pra S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Analisa faktor-faktor penyebab rework dan tingkat kesulitan pencegahannya pada pekerjaan struktur, finishing, dan mep
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Keselamatan kerja dan asuransi kecelakaan kerja pada proyek konstruksi
Project management
Analisis faktor-faktor yang mempengaruhi perpindahan pelaksana tetap pada perusahaan kontraktor di Surabaya
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Survei penerapan konsep sustainable construction di negara berkembang dan kemungkinan penerapannya di Indonesia