Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Author
Pranoto, Obed Antonio
Additional Author(s)
Gunawan, Fendy Peter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21121514/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 167
Bibliography: p. 105
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 167 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00883/07
(T) - 658.404 Pra S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Pandangan kontraktor dan konsultan terhadap aspek-aspek constructability pada proyek konstruksi di Surabaya
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Analisa dan evaluasi sisa material konstruksi pada pembangunan ruko di Surabaya
Hubungan antara kepemimpinan manajer proyek dengan kepercayaan pada proyek konstruksi
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi
Studi litelatur tentang perkembangan critical chain method