Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Catatan perjalanan pembangunan jembatan suramadu 2003-2006
Author
Additional Author(s)
Subagyo
Ashari
Publisher
Surabaya: Departemen Pekerjaan Umum Direktoral Jenderal Bina Marga, 2006
Language
Indonesian
ISBN
-
Series
Subject(s)
BRIDGES
SURAMADU BRIDGES
Notes
. .
Abstract
-
Physical Dimension
Number of Page(s)
1 Digital Video Disc
Dimension
4,75 inch
Other Desc.
[100 min.] : col.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01562/07
DVD 624.2 Cat
Library - 5th Floor/ AV
Available
Similar Collection
by author or subject
Pembangunan jembatan bentang panjang Suramadu
LKP : jembatan Nginden II
Containment of heavy vebicles by bridge parapets of post and rail type
Spesifikasi profil, pelat, dan batang tulangan baja struktural dari baja karbon dan baja paduan rendah kekuatan tinggi, serta pelat baja struktural paduan hasil quen dan temper untuk jembatan
Metode konstruksi jembatan rangka baja
LKP : fly over Sidoarjo
LKP : jembatan "Manyar" di jalan jurusan Gresik-Sembayat Km S.BAYA 27
Laporan Praktek Kerja (Direksi) Jembatan Gadukan dan Jalan Arteri Surabaya-Waru