Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan fasilitas dan sarana kerja bagian sortir dalam upaya penurunan tolakan di PT X
Author
Elfi
Additional Author(s)
Prasetya, Dhanny
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.03041222/IND/2007
Subject(s)
FACILITY MANAGEMENT
PRODUCTION MANAGEMENT
Notes
Appendix: p. 118 - 135
Bibliography: p. 117
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 135 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02600/07
(T) - 658.5 Elf P
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi pelaksanaan sistem pengendalian kualitas pada PT. X
Made-to-order lean
Perancangan metode dan fasilitas kerja pada bagian inspeksi akhir PT Elco Sidoarjo
Penurunan tingkat kecacatan di CV Surya Mas
Identifikasi proses produksi komponen guide dengan metode DMAIC pada supplier PT. X
Perancangan metode dan fasilitas kerja di PT Niki Tunggal dengan menggunakan pendekatan ergonomi
Managing business process flows
Analisa peningkatan output produksi pipa galvanized thread end dengan pendekatan simulasi di PT Spindo unit 3