Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa instalasi listrik plant 1 di PT Bumi Menara Internusa Surabaya
Author
Meilinda
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010547/ELK/2007
Subject(s)
ELECTRIC POWER DISTRIBUTION
ELECTRIC POWER SYSTEMS
Notes
Appendix
Bibliography: p. 91
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 91 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02791/07
(T) - 621.319 Mei A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP: Pembuatan gambar instalasi dan distribusi listrik dari transformator 2 dan 3 di PT Yanaprima Hastapersada
Joe's struggle in revealing his homosexuality in kushner's angels in america part one: millennium approaches
Evaluasi sistem informasi akuntansi pada siklus produksi di CV. Parta Jaya
The cues and the clues
Studi simulasi hybrid active filter untuk meredam harmonisa pada vacuum casting induction furnace dengan menggunakan program psim
Studi tentang kualitas daya listrik di PT. Sorini Towa Berlian Corporation
Principles of power system
LKP : PT Industri Sandang II (Persero) unit Patal Lawang