Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi overstrength factor kolom SRPMK menurut SNI 03-2847-2002 studi kasus: bangunan 5 bentang wilayah 2 peta gempa Indonesia
Author
Hermansaputra, Otniel Ricko
Additional Author(s)
Anggono, Hanny
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.11011531/SIP/2007
Subject(s)
BUILDINGS-EARTHQUAKE EFFECTS
CONCRETE CONSTRUCTION
Notes
Appendix
Bibliography: p. 122 - 123
Abstract
-
Physical Dimension
Number of Page(s)
xxvi, 123 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03695/07
(T) - 693.852 Her E
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Long-term serviceability of concrete structures
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Konstruksi beton
Pengaruh serat serabut kelapa dengan perlakuan kimia terhadap kuat tekan dan kuat tarik bata ringan
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Model penunjang dan pengikat (Strut-and-Tie Model) pada perancangan struktur beton
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu