Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Author
Santoso, Erwin
Additional Author(s)
Lelyana, Ivone
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011558/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix: p. 65 - 127
Bibliography: p. 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 127 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03718/07
(T) - 690.068 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan keuangan keluarga bapak Irsan pada tabungan, deposito, reksadana pasar uang, reksadana pendapatan tetap, reksadana campuran dan reksadana saham
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Motion and time study for lean manufacturing
Strategi perusahaan konstruksi di Surabaya di era krisis
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Manajemen dalam pelaksanaan pembangunan
Pemodelan kriteria-kriteria pemilihan tower crane pada proyek konstruksi