Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Author
Santoso, Erwin
Additional Author(s)
Lelyana, Ivone
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011558/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix: p. 65 - 127
Bibliography: p. 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 127 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03718/07
(T) - 690.068 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan keuangan keluarga bapak Irsan pada tabungan, deposito, reksadana pasar uang, reksadana pendapatan tetap, reksadana campuran dan reksadana saham
Handbook of construction management and organzation
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Penerapan material requirement planning pada suatu proyek konstruksi
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Pemodelan quality culture dan organizational climate pada perusahaan kontraktor
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0