Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa hybrid genetic algorithm pada permasalahan penjadwalan flowshop
Author
Soewanda, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011246/IND/2007
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
Appendix: p. 64 - 100
Bibliography: p. 63
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 100 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04834/07
(T) - 658.53 Soe A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem suplai tanpa penambahan tempat di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Manufacturing planning and control systems
Perbaikan lini produksi untuk peningkatan kapasitas pada PT. XYZ
Peningkatan produktivitas line spion on assy dengan metode lean manufacturing di PT. FSCM Manufacturing
Perbandingan sistem reorder point dengan distribution resource planning di PT.X.
Perancangan sistem perencanaan produksi dan pengendalian persediaan barang jadi di PT. X
Analisis komponen kritis supply chain management terhadap performance perusahaan
Production planning and industrial scheduling